√在线天堂中文最新版网,97se亚洲综合色区,国产成人av免费网址,国产成人av在线影院无毒,成人做爰100部片

×

maximum delay造句

"maximum delay"是什么意思   

例句與造句

  1. accepts the submission, but the caller can control only the maximum delay using the start timeout
    執(zhí)行提交之前,可能會發(fā)生延遲,但是調(diào)用者只能控制最大延遲(用啟動超時(shí))。
  2. aimed at the quality of service required by real-time service, an effective bandwidth calculating method for self-similar traffic is presented to provide guaranteed packet loss probability and maximum delay
    摘要針對多媒體實(shí)時(shí)業(yè)務(wù)需要提供特定服務(wù)質(zhì)量的情況,給出了一種能夠同時(shí)保證分組丟失概率和最大延時(shí)的自相似業(yè)務(wù)等效帶寬計(jì)算方法。
  3. by using fractional brownian motion envelope process and additional maximum delay constrain, the algorithm overcomes the shortcoming of those packet-loss-probability based methods which can not guarantee the packet maximum delay
    該算法采用分形布朗運(yùn)動包絡(luò)過程對自相似業(yè)務(wù)進(jìn)行分析,通過增加最大延時(shí)約束條件,克服了原先基于分組丟失概率的有效帶寬計(jì)算方法不能保證業(yè)務(wù)最大延時(shí)要求的不足。
  4. by using fractional brownian motion envelope process and additional maximum delay constrain, the algorithm overcomes the shortcoming of those packet-loss-probability based methods which can not guarantee the packet maximum delay
    該算法采用分形布朗運(yùn)動包絡(luò)過程對自相似業(yè)務(wù)進(jìn)行分析,通過增加最大延時(shí)約束條件,克服了原先基于分組丟失概率的有效帶寬計(jì)算方法不能保證業(yè)務(wù)最大延時(shí)要求的不足。
  5. this algorithm begins with yielding a least-cost spanning tree . then check every path from source to destination . if one path beyond the maximum delay, replace it with least-delay path in order to satisfying the delay bounded
    該算法在構(gòu)造滿足時(shí)延約束的組播樹過程中,先構(gòu)造最小生成樹作為初始樹,然后以時(shí)延最小路徑代替樹中的時(shí)延越界路徑,直至樹的根節(jié)點(diǎn)到所有目的節(jié)點(diǎn)的路徑滿足時(shí)延要求。
  6. It's difficult to find maximum delay in a sentence. 用maximum delay造句挺難的
  7. among these services, cbr and vbr services guarantee both the bandwidth that a connection will receive and the maximum delay that will be incurred by its cell . different from them, abr connections can only utilize the residual bandwidth of cbr and vbr connections
    abr則是利用cbr和vbr連接剩余的帶寬來承載“盡力傳輸”的業(yè)務(wù);此外,abr服務(wù)主要用于支持?jǐn)?shù)據(jù)應(yīng)用,在網(wǎng)絡(luò)信息傳輸中有著重要的地位。
  8. the paper also discusses that the range of random number in binary exponential back-off algorithm influences maximum delay of ethernet, and proper value of maximum random number can make ethernet with light load have better real-time property and satisfy process control
    本論文還論述了退避算法中的隨機(jī)數(shù)r的取值范圍會影響以太網(wǎng)的最大延時(shí);合理的選取r_(?)的值,能夠使輕負(fù)荷以太網(wǎng)具有更好的實(shí)時(shí)性,完全能夠滿足現(xiàn)場控制的實(shí)時(shí)性要求。
  9. through defining collision probability, collision probability coefficient, minimum feasible probability, tiny probability and maximum feasible collision times, the method for calculating maximum delay of network is clarified with the concept of maximum feasible collision times . it is illustrated that maximum delay of ethernet becomes bigger with its load increase
    定義了沖突概率、沖突概率系數(shù)、最小可能概率、微小概率、最大可能沖突次數(shù)等概念,用最大可能沖突次數(shù)這一概念,闡明了網(wǎng)絡(luò)最大延時(shí)的計(jì)算方法,并舉例說明了隨著網(wǎng)絡(luò)負(fù)荷的增加,網(wǎng)絡(luò)最大延時(shí)也相應(yīng)的增大。
  10. through defining collision probability, collision probability coefficient, minimum feasible probability, tiny probability and maximum feasible collision times, the method for calculating maximum delay of network is clarified with the concept of maximum feasible collision times . it is illustrated that maximum delay of ethernet becomes bigger with its load increase
    定義了沖突概率、沖突概率系數(shù)、最小可能概率、微小概率、最大可能沖突次數(shù)等概念,用最大可能沖突次數(shù)這一概念,闡明了網(wǎng)絡(luò)最大延時(shí)的計(jì)算方法,并舉例說明了隨著網(wǎng)絡(luò)負(fù)荷的增加,網(wǎng)絡(luò)最大延時(shí)也相應(yīng)的增大。
  11. based on internal rate of return as dynamic index of financial evaluation, the authors quantitatively analyse the critical point of investment inflation for a project, which can be explained as follows . assuming that the project is in a definite time limit during which the internal rate of retum should not be less than minimun attractive rate of return ( marr ), an analysis is made on the critical value of allowable maximum inflation of investment cost . similarly, assuming that the project is in a definite investment, an analysis is made on the critical point of allowable maximum delay of time limit for the project . by critical analysis of inflation of investment and delay of time limit for a project, an investigation can be made on the capacity for a project to bear the risk of investment inflation and time limit delay; and then a scientific basis can be offered for arranging invesetment and drawing up schedule of construetion
    根據(jù)建設(shè)項(xiàng)目財(cái)務(wù)評價(jià)的動態(tài)評價(jià)指標(biāo)??內(nèi)部收益率,定量地分析建設(shè)項(xiàng)目的投資膨脹臨界點(diǎn).假設(shè)在工期一定情況下,研究分析項(xiàng)目的內(nèi)部收益率應(yīng)該至少等于國家規(guī)定的行業(yè)基準(zhǔn)收益率時(shí),其允許投資費(fèi)用的最大膨脹臨界值.類似于投資膨脹臨界分析,假設(shè)在項(xiàng)目投資一定情況下,得到允許建設(shè)工期的最大膨脹臨界點(diǎn).通過投資與工期膨脹臨界分析,可以考察投資項(xiàng)目承受投資增加和工期拖延的風(fēng)險(xiǎn)能力,為合理安排投資和編制施工進(jìn)度提供科學(xué)依據(jù)
  12. the problems of robust stability for a class of lurie direct or indirect systems with time-delay and norm-bounded uncertainties are discussed using delay dependent method . method of linear matrix inequality is adopted to resolve the problems . comparing with the other sufficient conditions, the maximum delay obtained in this paper is less conservative
    2.針對具有范數(shù)有界不確定參數(shù)的lur記時(shí)滯系統(tǒng),分別給出了lurie直接型系統(tǒng)時(shí)滯相關(guān)的魯棒絕對穩(wěn)定性條件和穩(wěn)定化控制器以及l(fā)urie間接型系統(tǒng)時(shí)滯相關(guān)的魯棒絕對穩(wěn)定性條件,結(jié)論均采用線性矩陣不等式的形式給出,通過和最近的其他充分性方法比較最大的時(shí)滯界,表明本文方法大大減少了保守性。

相鄰詞匯

  1. "maximum daylight"造句
  2. "maximum deceleration"造句
  3. "maximum deflection"造句
  4. "maximum deflection angle"造句
  5. "maximum degree"造句
  6. "maximum delivery"造句
  7. "maximum demand"造句
  8. "maximum demand indicator"造句
  9. "maximum demand recorder"造句
  10. "maximum density"造句
桌面版繁體版English日本語

Copyright ? 2025 WordTech Co.